<?xml version="1.0" encoding="UTF-8" ?>
<rss version='2.0'>
    <channel>
        <title>MM Taylor &amp; Son News Feed</title>
        <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/rss</link>
        <description></description>
        <item>
    <title>New Build, Harworth Business Park Plot 2</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-harworth-business-park-plot-2</link>
    <description>
        This new build at Harworths Business Park has a lovely aesthetic look which comprises both brick and vertical cladding to create a stylish and modern look. A great project to be part of and really pleased with the final result.

Area:
Roof and vertical 3,200 m2

Products Used:
Coverworld twin skin built up system 240 mm on the roof and 180mm for the vertical.

Colour:
Roof - Goosewing gray,Vertical - Merlin Grey.

Time to complete:
4 weeks (Delivered Ahead of Schedule)

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Harworth Business Park Plot 3</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-harworth-business-park-plot-3</link>
    <description>
        Fantastic new build and a pleasureto be involved in this from start to finish. The silver composite panels and Merlin Grey panels created a sleek and stylish looking building.

Area:
Roof and vertical 2,000 m2

Products Used:
Coverworld twin skin built up system for the roof. Kingspan micro rib 80mm for the vertical.

Colour:
Roof Goosewing Grey &amp; Vertical Silver

Time to complete:
5 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Harworth Business Park Plot 4</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-harworth-business-park-plot-4</link>
    <description>
        This new build was created with a more agricultural look to go with the surroundings. Lovey finish from the brickwork to the cladding with a 45 degree split of the 2 materials. Olive green trims were used to complement the look.

Area:
Roof and vertical 1,800 m2

Products Used:
Coverworld twin skin built up system 240 mm on the roof and 180mm for the vertical.

Colour:
Moorland Green

Time to complete:
4 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Overclad, Sutton in Ashfield</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/overclad-sutton-in-ashfield</link>
    <description>
        This full overclad of an existing old roof in Sutton had all the existing roof lights replaced which created more natural light into the building.We raised the proposed new roof by 100mm so to create more depth to the new galvanized gutter system.

Area:
3,400 m2

Products Used:
All old roof lights were changed for new with a Coverworld CR 38 profile. A new galvanised gutter was fitted with ash and lacy bars providing the build up for the Coverworld CR38 sheet.

Colour:
Goosewing Grey.

Time to complete:
5 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Lockwoods</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-lockwoods</link>
    <description>
        With this new build the client requested a composite panel on the roof and the vertical to bring it up to the required U value. This was originally an old building with all new steel work fitted to enable new cladding to create a smart looking new modern build.

The client was very happy with the outcome.

Area:
Roof and vertical 1,200 m2

Products Used:
Kingspan Quadcore KS1000 roof panel 120mm roof and 80mm on the vertical.

Colour:
Juniper green

Time to complete:
2 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Refurbishment, Penny Hydraulics, Clowne</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/refurbishment-penny-hydraulics-clowne</link>
    <description>
        This full strip and resheet project was very challenging from start to finish due to bad weather and the need to keep the building water tight at all times which was accomplished.

A great transformation from an old and tired building in to the look of a new build. The client was amazed with how transformed the building.

Area:
Roof and vertical 2,900 m2

Products Used:
Coverworld twin skin built up system, 240 mm on the roof and 180mm for the vertical.

Colour:
Black.

Time to complete:
6 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Builds, Doncaster Airport</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-builds-doncaster-airport</link>
    <description>
        3 great units (7,8,9) all consisting of the same Kingspan Quad Core curved wall panels, micro rib panels and Trespa panels at the corners to create a 3 toned modern and sleek looking building.

Area:
7 - Roof and vertical 5,700 m2
8 - Roof and vertical 3,400 m2
9 - Roof and vertical 6,400 m2

Products Used:
Roof - Kingspan Quadcore ks1000 120mm
Vertical - Kingspan Quadcore curved wall panels 80 mm Kingspan Micro Rib 80mm Wood grain finish Trespa panels

Colour:
Roof Goosewing Grey Vertical Silver &amp; White Wood grain

Time to complete:
5 months

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Vertical Overclad, Birmingham</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/vertical-overclad-birmingham</link>
    <description>
        Great transformation of this complete full overclad in Birmingham.

A top hat system was used on the vertical and 3 contrasting colors to create a new modern stylish building

Area:
Vertical 3,700m2

Products Used:
Coverworld CW34

Colour:
Black, Merlin Grey, Goosewing Grey

Time to complete:
8 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Overclad, Riley’s Transport</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/overclad-rileys-transport</link>
    <description>
        This project had a full overclad of the roof and vertical to create a new modern looking garage.

A complete new galvanized gutter was fixed on top of the existing gutter along with galvanized tophats.Due to the Low pitch of the roof, we had to use a standing seam speedeck system which is ideal for low pitches. New barrel vaults were installed to replace the old vaults to add natural light into the building.

Area:
Roof and vertical 1,200 m2

Products Used:
Roof Standing Seam Speedeck &amp; Vertical Coverworld CW34

Colour:
Roof Goosewing Grey, Vertical Merlin Grey.

Time to complete:
2 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build Melody Maison, Harworth</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-melody-maison-harworth</link>
    <description>
        Great building to work on with a mixture of Coverworld twin skin system on the sides and kingspan on the gable ends incorporating all the windows to create a very
contemporary look.

Area:
Roof and vertical 4,900 m2

Products Used:
Roof - Coverworlds Twin skin built up system 240 mm.
Vertical - Coverworlds twin skin built up system 180m, Kingspan 80mm micro rib composite panels featuring at the gable end.

Colour:
Goosewing grey on roof with Merlin Grey on the sides with contrasting white composite panels

Time to complete:
6 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, M3 Changeparts</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-m3-changeparts</link>
    <description>
        The first of 9 new builds that weve been given the contract for. This new build (units 14 &amp; 15) comprises of 3 different types of cladding. Merlin grey vertical with a horizontal sheet along the top and horizontal composite covering the main office sides.

One very happy client as we finished ahead of schedule with no problems.

Area:
Roof and vertical 2,700 m2

Products Used:
Coverworld Twin skin built up system 240 mm roof 180mm on the vertical, Kingspan 80mm micro rib composite panels featuring at both ends and gable end.

Colour:
Roof - Merlin Grey
Vertical - Merlin Grey
Horizontal - Goosewing Grey
Horizontal - Goosewing Grey composite panels

Time to complete:
7 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Complete Full Refurbishment, Dronfield</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/complete-full-refurbishment-dronfield</link>
    <description>
        Great transformation on this refurbishment. The building was in a derelict condition before the works started. The asbestos roof was removed adhering to all safety precautions before a Coverworld twin skin system was installed. A twin skin system was also used after all the vertical cladding was removed. A great outcome on this and a very happy client.

Area:
Roof and vertical 3,900m2

Products Used:
Coverworld twin skin built up system 240 mm on the roof and 180mm for the sides.

Colour:
Roof - Goosewing grey
Vertical Goosewing grey.

Time to complete:
8 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Ilkeston</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-ilkeston</link>
    <description>
        Nice little new build, Small but tricky job due to the access not being great but overall a great looking building.

Area:
Roof and vertical 230m2

Products Used:
KingspanQuadcore KS1000 roof panel 120mm roof and 80mm on the vertical.

Colour:
Wedgwood blue

Time to complete:
1 week

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Overclad, Storforth Lane, Chesterfield</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/overclad-storforth-lane-chesterfield</link>
    <description>
        This client was having various issues with water ingress so we suggested on full overclad with is the most cost effective way to watertight a building with no disruption to the workforce inside. We installed a new and deeper galvanized gutter system with Z bars fitted and fixed to all the existing purlins. The top sheet was then fitted on one length to the Z bars.

Area:
Roof 1,250 m2

Products Used:
Coverworld CR32

Colour:
Goosewing Grey

Time to complete:
2 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Roof Refurbishment, Peugeot Garage, Chesterfield</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/roof-refurbishment-peugeot-garage-chesterfield</link>
    <description>
        Full strip and resheet of this building where the asbestos roof had come to the end of its lifespan. All the asbestos and plasterboard was removed and disposed of, adhering to all safety regulations. A coverworld twin skin built up system was then installed to bring it up to the value. We also transformed the asphalt flat pitched roof intoa 6 degree pitched roof with new steelwork.

Area:
Roof and vertical 1,200 m2

Products Used:
Coverworlds twin skin built up system 240 mm on the roof and 180mm on the sides.

Colour:
Gooswing grey

Time to complete:
6 Weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>Overclad, Lockwoods, Belper</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/overclad-lockwoods-belper</link>
    <description>
        All the old roof lights on this overclad were removed and replaced with new to create more natural lighting coming into the building. A ash and lacy ashgrid bar was then fixed onto the purlins below the asbestos. Insulation was added for a better Uvalue to the roof.

Area:
Roof 650m2

Products Used:
Ash and lacy ashgrid bars fixed on to the purlins and covered with insulation and a Coverworld CR34

Colour:
Goosewing Grey.

Time to complete:
2 weeks

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Barrel Roof, Matlock YHA</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-barrel-roof-matlock-yha</link>
    <description>
        A stunning curved barrel roof building when completed.

The roof consists of a built up system with an aluminum speeddeck standing seam system to a curved barrel roof in one length. A rainscreen system was used on all verticals which was fixed to a helping hands system.

Area:
Roof and vertical 1,800 m2

Products Used:
Roof Speeddeck &amp; Vertical Rainscreen system.

Colour:
Roof aluminum &amp; vertical Buttermilk

Time to complete:
3 Months

    
        
    </description>
    <pubDate>Wed, 30 Aug 2023 00:00:00 BST</pubDate>
</item><item>
    <title>New Build, Harworth Business Park Plot 1</title>
    <link>https://mmtaylorandson.co.uk/cladding-and-roofing-projects/new-build-harworth-business-park-plot-1</link>
    <description>
        This is a nice looking building that&#039;s been split into 2 units with a mirror image consisting of office blocks at each end.

White composite panels fixed above the brickwork have made a contrasting appearance.

Area:
Roof and vertical 3,800 m2

Products Used:
Coverworld Twin skin built up system 240 mm roof 180mm on the vertical,Kingspan 80mm micro rib composite panels

Colour:
Goosewing Grey on the roof with Merlin Grey on the sides with contrasting white composite panels.

Time to complete:
5 weeks

    
        
    </description>
    <pubDate>Fri, 28 Jul 2023 00:00:00 BST</pubDate>
</item>
    </channel>
</rss>